Find out what you’re already sitting on.
Blocks marked with a placeholder ID are awaiting written partner permission or supporting documentation. Per the build spec, no page publishes with an unresolved marker — see the placeholder register.
Usually you don’t need more space.
The assessment answers it before you commit to anything.

Every rung, scoped.
What we assess
Multiply
Where compute is memory-bound rather than core-bound. Fabric readiness. Net capacity and thermal impact of a pooled-memory deployment.
What we assess
Recover
Stranded and end-of-life assets. Recoverable floor area and recoverable capital.
What we assess
Uprate
Thermal and electrical headroom. Airflow and CFD analysis. Density ceiling by row. Retrofit path. Utility rebate and incentive eligibility.
What we assess
Extend
The gap remaining after the lower rungs — sized properly, so you buy modular capacity for what’s actually left.
What we assess
Deploy
Site readiness to receive and commission equipment.
The Stranded Capacity Report.
- 1
P12 current level on the BRUNS-PAK 1-10 Reliability Ranking
- 2
P12 target level for the planned workload, with the gap itemized
- 3
Usable kW currently stranded, broken out by cause — dead assets, thermal ceiling, memory-bound compute.
- 4
Cost to unlock at each rung.
- 5
Payback against a new build, and against colocation.
- 6
A recommended sequence — including what we advise you not to do.

Veridyn program management and report synthesis, with BRUNS-PAK engineering and thermal analysis.
P19 Owner: Veridyn
Assessment duration, fee structure and exactly what is included.
Why it isn’t free
Free assessments are sales calls with a deliverable attached, and they’re scoped to reach a predetermined conclusion. Ours is a paid engagement with an independent output. If the answer is that you should do nothing this year, that’s what the report will say — and you’ll have a document you can take to your board either way.
Find out what you’re already sitting on.
A Veridyn Capacity Assessment is a fixed-fee, P01 duration engagement that tells you how much usable capacity is stranded in your facility, what it costs to unlock, and in what order.
Fixed fee · independent output · a report you can take to your board.

