Capacity in weeks, where the room runs out.
Blocks marked with a placeholder ID are awaiting written partner permission or supporting documentation. Per the build spec, no page publishes with an unresolved marker — see the placeholder register.
Three situations. Only three.
- There’s no room left, and no adjacent space to take.
- The building genuinely can’t carry the thermal load, at any reasonable retrofit cost.
- You have a site with power and fiber but no building on it.
If none of those describe you, one of the lower rungs will cost less. We’d rather establish that first.


Proven before it ships.
P15 Owner: Veridyn
Veridyn’s own published modular delivery band — e.g. 250 kW to 5 MW, larger programs by consultation.
Workload profiling and sizing.
Specification against your requirements.
Integration with existing power, cooling and fiber.
Commissioning.
One contract from order to energization.
P14 Owner: RK
RK deployments, MW shipped, largest installation, achieved delivery times, UL listings, ISO 9001, seismic and wind ratings, measured PUE with methodology.
Not sure this is the right step? The Capacity Assessment tells you which one is.
Start with an assessment